Project Maintenance Needs and Dates
this page is meant to make all aware of upcoming maintenance project, needs and dates
Example: (opened or closed issue) drinker/ date/ checked by/ status/ equipment or repair parts/corrections made on date
CLOSED/Upper Turkey Creek Catchment/22April22/JM/maintenance, Cleanout, float adjustment/none/22Apr22
CLOSED/Upper Turkey Creek Catchment/22April22/JM/maintenance, Cleanout, float adjustment/none/22Apr22
**Open/Korn Canyon Drinker/17Apr21/DK/Tank is dry, hose separated at coupler/Goop, hose clamps maybe couplers if we want to switch out the location of the coupler on the hill/no corrections at this time
**OPEN/Old Sawmill Spring Drinker/24Apr22/TD/Approx a gallon every 30 minutes/Need a 1 1/4 inch plug to be installed at severed line end. Lines around drinker and 2 sets of valves should be snaked/ no corrections at this time
**OPEN/Old Sawmill Spring Drinker/24Apr22/TD/Approx a gallon every 30 minutes/Need a 1 1/4 inch plug to be installed at severed line end. Lines around drinker and 2 sets of valves should be snaked/ no corrections at this time